Sliding Friction Buffer Stop - Non-Hydraulic
Typically used on metro & main line - designed for different center impacts and side impacts with anti climbers ( if required ). Pure friction only and the number of friction shoes will depend on the train mass, impacting speed and the required deceleration.
Train mass: 408T Impacting speed 25km/h fitted with seventeen pairs of friction shoes with an Installation length of 15M
Train mass: 252T Impacting speed 15km/h fitted with eleven pairs of friction shoes in an installation length of 15M
Train mass: 450T Impacting speed 15km/h fitted with eight pairs of friction shoes with an Installation length of 15M